Service · Manufacturing

MRP for Manufacturers

Bills of materials, production orders, work centres and capacity — running properly. We implement Cin7 Core for light assembly and Odoo MRP for full manufacturing, so production stops being a black box and starts being a system you can plan.

What gets fixed

Manufacturers we meet usually fall into one of two camps. Light assembly shops on accounting-only systems are running production from spreadsheets, missing component shortages and over-promising lead times. Full manufacturers on legacy MRP have a tool nobody trusts because it was never tuned to how they actually work.

  • Multi-level BOMs — phantom assemblies, component substitutes, by-products, scrap factors
  • Production scheduling — work centres, capacity, sequencing, finite vs. infinite planning
  • Material requirements planning — auto-generated POs and production orders from forecast + sales orders
  • Shop floor data capture — barcode scanning, time tracking, material consumption, quality checks
  • Costing that reflects reality — landed cost, labour rates, overhead allocation, variance reporting

Cin7 Core or Odoo MRP — which?

Cin7 Core (light assembly)

Best for kitting, simple assemblies, food/cosmetics, contract pack, custom configurations. Cloud-native, fast to implement, integrates with Shopify and Xero out of the box. Not built for multi-stage routings or work-centre scheduling.

Odoo MRP (full manufacturing)

Best for multi-stage production, work centres with capacity, real shop floor (PLM, quality, maintenance, subcontracting). Modular — start with manufacturing, add quality and PLM later. Heavier implementation but no licence ceiling.

Best fit

Australian manufacturers, contract packers, makers and assembly shops with $1M–$50M revenue. Especially good fit if you’re juggling QuickBooks/Xero plus spreadsheets, or stuck on an old MRP that nobody can extend.

How a typical engagement runs

Discovery & fit

BOM walkthrough, production sample. We tell you Cin7 Core or Odoo MRP — straight answer.

Configure

Items, BOMs, work centres, routings, locations, costing rules. Migrated from your existing data.

Pilot run

One product line live first. Refine before rolling out wider.

Roll out & train

Operators on shop floor terminals, planners on the office side. Hypercare for the first month.

Common questions

How fast can you stand up Cin7 Core for assembly?

6–10 weeks for most light-assembly businesses. Faster if your master data is clean.

How long for full Odoo MRP?

3–6 months depending on complexity, integrations and how many sites.

Do you do shop floor hardware?

We spec barcode scanners, label printers and shop floor terminals; we’ll work with your IT supplier on the install.

Will it talk to Xero?

Yes. Both Cin7 Core and Odoo connect to Xero so finance keeps the ledger they know.

Get production under control

Book a 15-minute call to see whether Cin7 Core or Odoo MRP fits.